Roles & Responsibilities
Job Description & Requirements
· ConductingSWC coordination meeting with LTA E&M team, LTA project team, N1007 andSWC’s.
· Checkingthe BIM model before issuing to N1007 for CCSM, CSD/SEM, CSCSM for theirpreparation and submission to LTA.
· Reviewingconsultant drawing and submission to LTA and N1007 for review and approval.
· DesigningTunnel cable brackets, Service crossover bridge, VICP and CRP for LTA’s SystemWide Contractors (SWC).
· Liaisingwith vendor to check and verifying the LTA design requirements and compliances.
· PreparingE&M Niches drawing as per contract and LTA/SWC’s requirement,
· CheckingST submission drawing, Tunnel alignment drawings, vertical alignment drawings& long section drawings for coordination with SWC’s and tunnel bracketdesign.
· Designingtunnel walkaway pipe trench based on working session with LTA SWC coordinatorand consultant as per their requirement.
· Coordination with vendor for Architectural works.
· Coordinating with clients, SWC,project team and contractors for E&M designand construction works.
· Assistingand explaining BIM team to model the E&M related works like Plumbing,Sanitary, CSD/SEM, Airwell and submission to LTA for approval.
· Liaisingwith Architect for design coordination.
· AttendingLTA’s Line wide NSC E&M meeting, Weekly design meeting and progressmeeting.
· Liaisingwith own structural consultant for M&E design requirement and coordination.
· Liaisingwith Interfacing contractors for SWC related matters.
· AssistingPD/SPM for urgent works and E&M related works.
· Preparingtemporary design drawing for Bus stop, Pedestrian Overhead bridge, Walkaway forLTA approval.
· Preparingdesign drawings like SWC equipment delivery and future replacement drawing, CSDdrawing for LTA review and approval.
· Reviewingall LTA E&M SWC design drawing for coordination such as Tunnel ventilationsystem, Niches, AID camera, LUS, LBS, MVMS, PA, CCTV etc.
· Liaisingwith LTA MES team for Tunnel jet fan coordination and Air Monitoring Systemequipment’s.
· AttendingBIM coordination meeting with N1007 & LTA for BIM CCSM and CSCSMcoordination.
· Preparingcover letter, scope of works and formal drawing submission with QAQC team fordrawing submission to LTA.
· Highlighting QS team for changes in tender drawing compare with latest issueddesign drawings.
· ExecutingSingapore standards COP and requirements.
· PrepareSWC coordination meeting minutes.
· UpdatingSWC items inputs/status in LTA progress and design meeting.
· Checking& review documents & drawings before submission to clients.
· PreparingE&M Niches drawing.
· Liaisingwith Architect & structural consultant for design coordination.
· AssistingDesign Manager/Project Director for urgent works and E&M related works.
· Preparingtemporary design drawing.
· Ad-hocworks.
Tell employers what skills you have
IP CCTV
Equipment Drawing
Operational Requirements
MVVM
Cable installations
Assembly Drawings
CO-PA
Plan Review
Sla Management
Niche Markets
Conference Coordination
Liaise With System Vendors
Engineering Drawing and Design Specifications
LBS
Production Drawings
CSCRM